home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V12_4 / V12_450.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  9KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/4b5KeWC00VcJQKZU5f>;
  5.           Fri, 12 Oct 1990 03:02:59 -0400 (EDT)
  6. Message-ID: <wb5Kcdu00VcJ8KWU4O@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Fri, 12 Oct 1990 03:01:15 -0400 (EDT)
  12. Subject: SPACE Digest V12 #450
  13.  
  14. SPACE Digest                                     Volume 12 : Issue 450
  15.  
  16. Today's Topics:
  17.               Re: Launch cost per pound
  18.               Galileo Update - 10/11/90
  19.  
  20. Administrivia:
  21.  
  22.     Submissions to the SPACE Digest/sci.space should be mailed to
  23.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription notices,
  24.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  25.              tm2b+@andrew.cmu.edu
  26.  
  27. ----------------------------------------------------------------------
  28.  
  29. Date: 9 Oct 90 14:15:24 GMT
  30. From: edsews!teemc!fmeed1!cage@uunet.uu.net  (Russ Cage)
  31. Subject: Re: Launch cost per pound
  32.  
  33. In article <0093DE36.2F98A6C0@KING.ENG.UMD.EDU> sysmgr@KING.ENG.UMD.EDU (Doug Mohney) writes:
  34. >Ok. How do I get licensed to be a certified Soviet-booster clone? You think
  35. >we could buy the blueprints to everything and get someone like GM Heavy
  36. >Equipment to build 10 launchers a year?
  37.  
  38. I seem to recall that the Soviets are licensing the design for the
  39. kerosene/oxygen engine powering the Energia strap-ons.  Go for it.
  40.  
  41. >Now, who wants to loan me $2 billion dollars for startup costs? ;-)
  42.  
  43. Show me a business plan and I'll call up the venture capitalists.
  44. -- 
  45. Russ Cage    Ford Powertrain Engineering Development Department
  46. Work:  itivax.iti.org!cfctech!fmeed1!cage   (Business only, NO CHATTY MAIL PLS)
  47. Home:  russ@m-net.ann-arbor.mi.us  (Everything else)
  48. I speak for the companies I own, not for the ones I don't.
  49.  
  50. ------------------------------
  51.  
  52. Date: 11 Oct 90 23:42:01 GMT
  53. From: usc!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke@ucsd.edu  (Ron Baalke)
  54. Subject: Galileo Update - 10/11/90
  55.  
  56.  
  57.                               GALILEO
  58.                        MISSION STATUS REPORT
  59.                           October 11, 1990
  60.  
  61.      As of noon (PDT) Thursday, October 11, 1990, the Galileo spacecraft is
  62. 32,399,810 miles from the Earth and traveling at a heliocentric speed of
  63. 53,010 miles per hour; distance to the Sun is 113,033,200 miles (1.22 AU).
  64. The spacecraft is spinning at 3.15 rpm with a sun point angle of 5.6 degrees.
  65. Round trip light time is 5 minutes, 52 seconds.
  66.  
  67.      Sometime between the end of the DSN (Deep Space Network) track on
  68. October 4 and the start of track on October 5, the eighth despun CDS (Command
  69. Data Subsystem) Critical Controller A POR (Power on Reset) telemetry indication
  70. was observed.  The signature was the same as that observed in the previous
  71. seven occurrences.  Due to the weekend, recovery actions to reset the telemetry
  72. indication were completed the following Monday, October 8. Recovery actions
  73. were successfully completed and a NO-OP command was sent to reset the Command
  74. Loss Timer to 264 hours, the planned value for this mission phase.
  75.  
  76.      Two delta DOR (Differential One-way Ranging) activities were successfully
  77. completed on October 8 and 10, one prior to and one after TCM-6 (Trajectory
  78. Course Maneuver 6) on October 9.  These two activities were both North/South
  79. passes using the 70 meter antennas in Goldstone and Australia; and were
  80. the fifth and sixth of 17 planned prior to Earth closest approach.  Delta
  81. DOR is an additional navigation data source in addition to doppler and ranging
  82. data.  When the delta DOR signal is modulating the downlink carrier, spacecraft
  83. telemetry data from the TMU (Telemetry Modulation Unit) is interrupted; no
  84. spacecraft telemetry is transmitted during this interruption.
  85.  
  86.      Another USO (Ultra Stable Oscillator) test was conducted on October 8.
  87. This test provides continuing trend information characterizing the performance
  88. of the ultra-stable RF downlink frequency source.
  89.  
  90.      Cruise Science Memory Readouts (MROs) were successfully performed for
  91. the EUV (Extreme Ultraviolet Spectrometer), DDS (Dust Detector) and MAG
  92. (Magnetometer) instruments on October 8.
  93.  
  94.      The TCM-6 maneuver sequence memory load was successfully transmitted and
  95. received by the spacecraft on October 8. The maneuver was executed, as planned,
  96. on October 9.  The first burn segment was completed without incident using
  97. the axial (z) thrusters.  A preliminary navigation assessment indicates a small
  98. overburn of about 0.8 percent compared with the nearly 2 percent overburn for
  99. TCM-5.  The TCM-6 maneuver was the first axial burn design incorporating the
  100. performance results observed in TCM-1 and TCM-5.  The second burn segment using
  101. the lateral (L) thrusters was also completed successfully without incident.
  102. Due to Earth look angle considerations, it is not possible to reliably assess
  103. the total affect of lateral burn.  Subsequent orbit determination data will
  104. provide an assessment of the total maneuver.
  105.  
  106.      Spacecraft performance during the maneuver was excellent. All RPM (Retro
  107. Propulsion Module) pressures and temperatures were near expected levels; the
  108. thruster temperature profiles were similar to those of previous burns.  The
  109. L2B thruster temperature was inferred from the cluster temperature sensor
  110. readings.  No unexpected cluster temperatures were observed.  After the axial
  111. burn segment, the sequence allowed time for a spin rate correction and
  112. pointing error correction; neither correction was necessary since the attitude
  113. excursions were small (less than 4 mrad) for both burn segments.
  114.  
  115.      Commands were sent on October 11 to reconfigure the CDS spun hardware via
  116. critical controller commands to enable the telemetry data rate (1200 bps)
  117. switch planned for October 16. This series of commands also configured the
  118. CDS to route 40 bps uncoded data to the TMU low rate channel for downlink
  119. transmission.
  120.  
  121.      Commands to update the star vectors were sent on October 8.  This updated
  122. star information will be used for the forthcoming activities later in the VE-5
  123. (Venus-Earth 5) stored sequence.
  124.  
  125.      The 19th RPM flushing activity was successfully performed on October 11.
  126. All thrusters were flushed during this activity except the P-thrusters which
  127. were last used for the October 4 sunpoint activity.  Detailed thruster
  128. temperature profiles are not available due to operation at 40 bps.  Successful
  129. flushing was inferred from other spacecraft telemetry measurements/events
  130. including AACS (Attitude and Articulation Control Subsystem) performance and
  131. thruster counts.
  132.  
  133.      The AC/DC bus imbalance measurements exhibited some activity.  The AC
  134. measurement increased 15DN during a period of no spacecraft activity, about 12
  135. hours prior to TCM-6 and then dropped about 12DN several hours after TCM-6,
  136. and is stable near 48.6 volts.  The DC measurement began acting erratically
  137. about 30 hours after TCM-6 with fluctuations up to 65DN and is near 19.8
  138. volts. All other power-related and subsystem telemetry measurements are
  139. normal.
  140.  
  141.      The Project reviewed and approved the TCM-6 maneuver sequence on
  142. October 5.  The Project also reviewed and approved the Final sequence and
  143. command generation product for the VE-9 sequence on October 9.  This sequence
  144. controls the spacecraft activities from October 22 to December 7 and includes
  145. the PLS (Plasma) instrument shade retraction, Probe checkout, and the
  146. playback of Venus data activities.
  147.  
  148.      The Preliminary GDS (Ground Data System) Test Plan for Earth 1 support
  149. was distributed for final review.  End-to-end GDS testing is scheduled to start
  150. on October 26th in conjunction with Mission Readiness Tests (MRT) by the DSN.
  151. Galileo MRTs with the 34 meter HEF (High Effiecency) antennas have been
  152. successfully completed at Goldstone and Spain.  Normal ranging operations using
  153. 3db suppression rather than 9 db are now possible due to the improved signal
  154. levels.
  155.       ___    _____     ___
  156.      /_ /|  /____/ \  /_ /|
  157.      | | | |  __ \ /| | | |      Ron Baalke         | baalke@mars.jpl.nasa.gov
  158.   ___| | | | |__) |/  | | |___   Jet Propulsion Lab | baalke@jems.jpl.nasa.gov
  159.  /___| | | |  ___/    | |/__ /|  M/S 301-355        |
  160.  |_____|/  |_|/       |_____|/   Pasadena, CA 91109 |
  161.  
  162. ------------------------------
  163.  
  164. End of SPACE Digest V12 #450
  165. *******************
  166.